Of payments being made on the spot I consider to be fully justified by the advantages gained. It allows the contractors to be always on the ground to look after and pay their men. It also avoids all risk of robbery to the contractor which is greatly appreciated by them in outlying districts.
15.
With all this I venture to say that my Engineers spend more time on the works than the Public Works Department Engineers. From what I have seen in the Colony, I consider too much trust is placed in the sub-ordinates in charge of works carried out by the Public Works Department and I consider that better and cheaper work would be done if Engineers were resident on the large works carried out in outlying districts.
16.
The first sentence of the last paragraph in page 5 is in my opinion rather strong and uncalled for, and I can only presume that the Honourable Director of Public Works has written it in ignorance of the orders I have received on the subject.
17.
I do not consider the Public Works Engineers capable of forming an opinion on the various systems under which work can be carried out. They come out to
ד
71
taal Textsew tod erið að bæðiste raw #trit
.SI
Tow end trata of nodsantnov egral on teg biveo I bna last
nevä .eetan snæðidroze da ¿qnoxe bad on Bew nonaea sɗð na
*Įtaun od no Jug etow offw nem eaodt to zeltainu erið ritkw
,800 mпixTow Isutom edit of babba erotomijnoo vijeg ext
TodoBrinco zid odt nadt "oquedo dova »nob gnied at ITOW ONI
.beTebnet
of payments being made on the spot I consider to be fully
justified by the advantages gained. It allows the con-
-tractors to be always on the ground to look after and pay
their men. It also avoids all risk of robbery to the con-
-tractor which is greatly appreciated by them in outlying
districts.
15.
belistne Xrow to tavoms erit betaamos nerid OH
.GI
**\ow ol[d¶ eft dilw mejaye ye Tebow affld sit gniyaq ni
end anoidovnjani ya rebnu aysa of ‚metuyn İremÝLaqoi
ezeenigni ant yď ebam eð of evad allld set bra etnomDIKE SOM
adтow oliɗui est tant ynolod sad to wise and rot #qod I
a di Tebienoo I ton ob vedd 11 .emer end ob areenigmä
a od bedavit ad ton biroda Stow dove as sxadaim fuerE
anted as invasos ent of viltres I «fametot étanibroďua
.adow slidut to rojoeTia Giɗarsonok erið asob os
JO0700
ISTUɛASTT sdt yd botsinger al tuo eben seiqoɔ to redmun edr
ant ni two sham teɗawn erið besore dan soOD SKURBIq I bns
«İnandıaqeⱭ ***oW si[dưa
betatinasoen ai rebroyaq s to zNIS/TW ONT
bra toqe edd no abam eď od ead tnemyaq tadt tost odt vď
wolls of an oa bellažne daoo antxe eft .vtunsert arið mi don
to
With all this I venture to say that my
Engineers spend more time on the works than the Public
Works Department Engineers. From what I have seen in the
Colony, I consider too much trust is placed in the sub-
-ordinates in charge of works carried out by the Public
Works Department and I consider that better and cheaper
work would be done if Engineers were resident on the large
works carried out in outlying districts.
16.
The first sentence of the last paragraph in
page 5 is in my opinion rather streng and uncalled for,
and I can only presume that the Honourable Director of
Public Works has written it in ignorance of the orders I
have received on the subject.
17.
I do not consider the Public Works
Engineers capable of forming an opinion on the various
systems under which work can be carried out. They come out
to
No comments yet.
Private notes are available after approval.